5 takeaways: OpenAI & Oracle’s data center sparks clash between rural life, AI ambitions

Jennifer Eberbach jeberbach@mlive.com
0 Min Read
The $7 billion project will transform 250 acres of farmland and require energy equivalent to a nuclear power plant to fuel OpenAI and Oracle’s ambitions.

This post was originally published on this site

How to get the best auto loan rate in 2023. student visa (f1). Post lockdown back to fitness outdoor bodyweight workout free range entrepreneur.